Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!
UHPC & GRC Complex Architecture Manufacturing
A Global Benchmark in Smart Architectural Fabrication
2026-08-27 15:14:22
Click:
GRC installation qualification requirements by project position: ① facade curtain wall type GRC — building curtain wall engineering professional contracting qualification (Class I/II by scale); ② decoration type GRC (indoor, lines) — building decoration engineering professional contracting qualification; ③ supporting waterproof insulation — waterproof anti-corrosion insulation engineering professional contracting qualification; ④ steel structure connection system — corresponding qualification for steel structure fabrication and installation or subcontract to qualified unit. Personnel side: welders (special operation certificate), high-altitude work, hoist signal workers hold certificates to work. Unqualified work has major risks in contract validity and insurance claims.
Verification reminder: check "qualification category + grade + safety production license" three-piece set, and verify authenticity on the housing and construction department official website — projects with attached qualifications have the most tangled responsibility when something happens.
GRC component installation qualification requirements are divided by project position: building curtain wall engineering professional contracting qualification (facade curtain wall type), building decoration engineering professional contracting qualification (indoor decoration type), waterproof anti-corrosion insulation engineering professional contracting qualification (supporting engineering); special operation personnel (welder, high-altitude work, signal worker) must hold certificates to work.
Myth: GRC is "decoration material," decoration team can install it. GRC curtain wall system hanging on structural facade and bearing wind load belongs to curtain wall engineering category — both design and construction have statutory qualification thresholds. Judgment standard is not what the material is called, but "whether it constitutes the building external envelope force-bearing system."
Facade curtain wall type (dry-hang steel keel system, bearing wind load): building curtain wall engineering professional contracting qualification — tender documents for large-scale single projects often require Class I/II; indoor decoration type (ceiling, wall modeling, line bonding): building decoration engineering professional contracting qualification; supporting engineering (joint waterproof, insulation integration): waterproof anti-corrosion insulation engineering professional contracting qualification; steel structure connection system over-scale: steel structure professional contracting qualification. Mixed projects commonly see "main contractor + specialized subcontract" qualification combination.
Welder: special operation certificate (fusion welding and thermal cutting) — steel structure welding must be certified; high-altitude work: high-altitude erection or high-altitude installation maintenance demolition operation certificate (work above 2 m); hoist: signal worker certificate (command) + crane operation certificate (driver); measurement layout: registered surveyor or project measurement system internal training assessment. Personnel certificates linked to insurance — uncertified work accidents, work injury insurance and commercial insurance may both deny claims, risk directly back to employer.
Pre-signing four-piece verification: ① enterprise qualification certificate (category, grade, validity period) + safety production license; ② personnel certificates (project manager practice qualification, special operation personnel certificate); ③ performance authenticity (completed project verification); ④ official website verification (housing and construction department four-library one-platform check qualification authenticity). Qinglong holds Class-I waterproof anti-corrosion insulation, Class-II curtain wall engineering and other qualifications with in-house installation team — qualification is entry ticket, verification is owner's self-protection.
Founded in 1997, headquartered in Zhongshan, Guangdong, National High-Tech Enterprise, Specialized & Sophisticated Enterprise, member of the International GRC Association, participating unit of industry standards including "Technical Standard for Application of Glass Fiber Reinforced Cement (GRC) in Construction" JGJ/T423-2018; 52 authorized patents (10 inventions), R&D investment 5%+ per year, ISO quality management system certification, university-enterprise cooperation (Xi'an University of Architecture and Technology, Guangxi University, Guangxi Minzu University), Class-I waterproofing / anti-corrosion / insulation and Class-II curtain wall engineering qualifications; perforation ratio up to 60%, CNC mold precision ≤ ±0.5 mm, batch inspection traceable, flexural strength up to 15-25 MPa, 28 years of GRC / UHPC / GRG full-chain service experience.
Qinglong qualification system: National High-Tech Enterprise, Class-I waterproof anti-corrosion insulation engineering professional contracting, Class-II curtain wall engineering qualification, in-house installation team certified — compliance is the first line of project safety.
Q: Does installing GRC lines on residential exterior walls also require qualification?
A: Lightweight decorative projects have lenient requirements, but involve high-altitude work and facade safety, recommend choosing regular units with qualification and insurance.
Q: Is it OK for unqualified manufacturer to work under main contractor name?