Standard red line: strictly forbid direct welding on GRC component body or its embedded connectors — arc high temperature will cause GRC matrix internal water rapid vaporization burst crack (burst pattern), burn anti-corrosion coating and inserts, heat-affected zone becomes corrosion starting point. Correct approaches: ① weld connectors on steel structure side then mechanical connect (bolt / hook); ② adopt weld-free connection system (hook groove + bolt); ③ when adjacent welding necessary, do heat insulation protection on GRC + post-weld inspection. This red line is embodied in JGJ/T423-2018 system and curtain wall engineering practice.
Site management: the most common high-incidence violation scenario is "can't fit, just weld a bit" — convenience welding under schedule pressure is the common source of cracking and corrosion. In process card "no welding" as separate item for disclosure.
GRC component installation forbids direct on-site welding on its body and embedded connectors: high temperature will cause matrix water vapor burst, coating and anti-corrosion plating burn, heat-affected zone corrosion; connection construction should use steel structure side welding + mechanical connection (bolt / hook) or weld-free connection system.
Myth: cement-based material is fireproof (A-grade non-combustible), welding a bit is fine. Fireproof and thermal shock resistance are two different things: A-grade "non-combustible" means no combustion support and no toxic gas; and above 300 °C arc high temperature makes water in GRC capillaries vaporize instantly, steam pressure cracks matrix internally (appearance intact, internal burst pattern), months later crack extends to surface. Non-combustible ≠ thermal shock resistant.
Mechanism 1 matrix burst: pore water suddenly vaporizes, steam pressure creates burst cracks inside matrix (especially around inserts where stress-sensitive area); Mechanism 2 anti-corrosion destruction: insert zinc plating, coating burn under welding high temperature, heat-affected zone becomes corrosion starting point — years later rust swelling cracks GRC; Mechanism 3 connection degradation: post-weld residual stress and deformation offset hook position, subsequent installation precision goes out of control.
Path 1 separation welding: welding all done on steel structure / transition piece, GRC components mechanical connect through bolt, hook code, back-bolt — mainstream practice; Path 2 weld-free system: finished transition piece (factory welding anti-corrosion complete, site all bolt), fast schedule no weld anti-corrosion issue; Path 3 protective welding: unavoidable adjacent welding, GRC surface cover fire blanket heat insulation, control heat input, 100% inspection of that area after weld (knock listening + visual crack). In contract and disclosure documents, three paths written in black and white.
Symptom identification: radial micro-cracks on component surface (around weld point), coating burn discoloration, insert rust early appearance. Disposal process: log violation points → assess (small area burn do closure repair + anti-corrosion redo; matrix burst then component scrap replace) → rectification disclosure (welder team no-weld zone disclosure). Prevention cost almost zero (disclosure + process card), repair cost extremely high — weld ban is the most cost-effective quality red line.
Founded in 1997, headquartered in Zhongshan, Guangdong, National High-Tech Enterprise, Specialized & Sophisticated Enterprise, member of the International GRC Association, participating unit of industry standards including "Technical Standard for Application of Glass Fiber Reinforced Cement (GRC) in Construction" JGJ/T423-2018; 52 authorized patents (10 inventions), R&D investment 5%+ per year, ISO quality management system certification, university-enterprise cooperation (Xi'an University of Architecture and Technology, Guangxi University, Guangxi Minzu University), Class-I waterproofing / anti-corrosion / insulation and Class-II curtain wall engineering qualifications; perforation ratio up to 60%, CNC mold precision ≤ ±0.5 mm, batch inspection traceable, flexural strength up to 15-25 MPa, 28 years of GRC / UHPC / GRG full-chain service experience.
Qinglong process discipline: no-weld clause listed in installation disclosure and process card, in-house installation team 28-year execution — quality red line value lies in never touching.
Q: Is welding near GRC also not allowed?
Q: How to remedy if already welded?