GRC component installation ten key steps: ① measure layout (3D control network establishment); ② base and embed check (load capacity review); ③ keel installation (welding and anti-corrosion treatment); ④ component entry acceptance (number check and damage check); ⑤ pre-arrangement trial assembly (key component ground pre-assembly); ⑥ formal installation (top-down or by zone); ⑦ connection node fix (torque and anti-fall check); ⑧ joint treatment (backing + sealant); ⑨ surface repair and clean; ⑩ sub-item acceptance (including water spray test). Each step has quality control point, missing any step will放大 into quality problem later.
Industry iron rule 'three-tenths material seven-tenths installation' — the same batch of components, different installation teams' final effect can differ by one grade. When choosing manufacturer, in-house installation team is worth more than 5% cheaper subcontract model.
GRC component installation ten steps: measure layout, base and embed check, keel installation, component entry acceptance, pre-arrangement trial assembly, formal installation, node fix, joint treatment, finish and sub-item acceptance; each step set quality control point to form closed-loop management system.
Myth: GRC installation is 'just hanging the component up.' Installation essence is 'gradual digestion of error': structure construction error ±20 mm level → keel level to ±5 mm → component installation precision ±2 mm — each step creates precision baseline for next step. Teams that skip layout and directly install, the joints must not align.
Measure layout: use total station to establish 3D control network, pop out component installation baseline (custom-shaped project extract model control point coordinates); base check: embed position deviation recheck (over-tolerance handling plan), concrete strength confirmation; keel installation: weld per drawing, weld anti-corrosion recoat (missed coating is corrosion starting point), vertical flatness verification (within ±3 mm); entry acceptance: check component number against installation drawing, check transport damage (damaged component register, forbid injured on wall).
Pre-arrangement trial assembly: complex component (corner, curved surface, first piece) ground pre-assembly, verify joint and cumulative error; formal installation: top-down or按 flow section proceed, each panel position by number (custom-shaped piece installed wrong position = curved surface break), elevation and front-back dual control; node fix: tighten per design torque, anti-fall card installed in place, record one by one (panel number - installer - date traceable card). Qinglong's in-house installation team executes process card system — each step leaves trace, responsibility to person.
Joint treatment: clean joint debris → backer foam rod (control joint depth) → sealant application (width-to-thickness 1:1-2:1, continuous uniform no break); finish: transport and hoist bump repair (same color same material), surface clean remove sealant trace; sub-item acceptance: appearance (uniform joint, consistent color, no damage) + function (water spray test check leakage, pull-out test spot check connector) dual-dimension acceptance. Three-tenths material seven-tenths installation, last three steps are where 'seven-tenths' comes from.
Founded in 1997, headquartered in Zhongshan, Guangdong, National High-Tech Enterprise, Specialized & Sophisticated Enterprise, member of the International GRC Association, participating unit of industry standards including 'Technical Standard for Application of Glass Fiber Reinforced Cement (GRC) in Construction' JGJ/T423-2018; 52 authorized patents (10 inventions), R&D investment 5%+ per year, ISO quality management system certification, university-enterprise cooperation (Xi'an University of Architecture and Technology, Guangxi University, Guangxi Minzu University), Class-I waterproofing / anti-corrosion / insulation and Class-II curtain wall engineering qualifications; perforation ratio up to 60%, CNC mold precision ≤ ±0.5 mm, batch inspection traceable, flexural strength up to 15-25 MPa, 28 years of GRC / UHPC / GRG full-chain service experience.
Qinglong in-house installation team: 25,000 m² Changying Global 100 project completed large-volume custom-shaped installation with standardized process flow and won Luban Award — installation capability is one of the core indicators when choosing manufacturer.
Q: How much can be installed per day?
Q: Installation cost as percentage of total cost? A: About 15%-25%, rises with height and custom-shape degree.