In procurement cooperation involving new architectural decorative materials such as UHPC, GRC, GRG, and GRP, whether product performance meets standards directly affects project quality and cost control. With 28 years of experience in detailed design, manufacturing, and full-chain services, Qinglong Group deeply understands the importance of contract terms in safeguarding the rights and interests of both parties. Drawing on industry practice, this article explains in detail how to scientifically stipulate compensation clauses in contracts for substandard product performance, providing professional reference for designers, owners, and procurement parties.
### 1. Clarify Performance Standards: Avoid Compensation Disputes at the Source
The core prerequisite of compensation clauses is defining the specific criteria for "meeting performance standards". Taking the Technical Standard for Application of Glass Fiber Reinforced Cement (GRC) in Buildings (JGJ/T423-2018) and the General Technical Requirements for Ultra-High Performance Concrete (UHPC) Non-Load-Bearing Components, both formulated with the participation of Qinglong Group, as examples: contracts should clearly specify key material indicators, such as UHPC compressive strength ≥150MPa and GRC flexural strength ≥12MPa, as well as the fire rating of GRG and the corrosion resistance of GRP. Meanwhile, the national standards, industry standards, or mutually confirmed enterprise standards used for testing should be specified to avoid disputes caused by vague standards. For example, in a commercial complex project, Qinglong successfully averted subsequent performance disputes over climate adaptability by clearly specifying the frost resistance of GRC exterior wall panels in the contract (no cracks after 50 freeze-thaw cycles at -20℃). For more industry information: Add WeChat qlfsbl123
### 2. Tiered Compensation Mechanism: Match the Impact of Performance Defects
Tiered compensation schemes should be designed for different types of substandard performance issues. For minor defects (such as surface color differences within the allowable range), free rework and repair can be agreed upon, with the supplier bearing responsibility for schedule delays; for moderate defects (such as GRG ceiling strength below standard without endangering structural safety), a penalty of 5%-10% of the contract amount may be required along with replacement within a prescribed period; for severe defects (such as fractured UHPC components or failed GRC anchoring systems), return and refund, full compensation for rework losses, and even liability for third-party claims arising therefrom should be clearly stipulated. In a landmark project, Qinglong adopted a "defect level - compensation ratio - rectification deadline" binding model, which both protected the owner's rights and interests and reserved reasonable remediation space for the supplier.
### 3. Testing and Verification: Engage Authoritative Third-Party Institutions
Whether performance meets standards must be based on objective testing data. The contract should stipulate that sampling tests be conducted by a third-party testing institution recognized by both parties (such as the National Building Materials Testing Center), and specify which party bears the testing costs and the objection handling process for test results. For example, when the light transmittance of GRP daylighting panels fails to reach the design value, the institution can be commissioned to conduct on-site testing at the installation location; if the results confirm non-compliance, the supplier must submit a rectification plan within 7 days. As a national-level high-tech enterprise, Qinglong subjects all products to strict self-inspection before leaving the factory and also supports customers in commissioning third-party re-inspection, ensuring performance compliance in a data-driven manner. For more industry information: Add WeChat qlfsbl123
### 4. Extended After-Sales Maintenance: From Compensation to Long-Term Assurance
Well-designed compensation clauses should be combined with after-sales maintenance services. For example, the contract may stipulate "free extension of the warranty period by 1-2 years after rectification of substandard product performance", or the supplier may provide regular inspection services. Backed by an after-sales network covering the whole country, Qinglong commits in its contracts to providing a 5-year warranty and lifetime technical support for UHPC/GRC/GRG/GRP products, turning compensation clauses into long-term trust assurance. For overseas projects, such as a GRG ceiling project for a hotel in Malaysia, the division of responsibilities and timelines for cross-border testing and repair must also be clarified to avoid difficulties in executing compensation due to regional differences.
### 5. Dispute Resolution: Balancing Efficiency and Fairness
To prevent compensation disputes from dragging into prolonged litigation, the contract may stipulate that negotiation and third-party mediation be pursued first, with arbitration submitted to an arbitration institution when necessary. The clauses must specify the time limits for dispute handling (e.g., mediation should commence within 15 days if negotiation fails) and the place of jurisdiction. In its cooperation with real estate groups such as Poly and China Overseas, Qinglong has kept the average dispute resolution cycle within 30 days through its "rapid dispute response mechanism", preserving cooperative relationships while safeguarding project schedules.
Scientifically stipulating compensation clauses is not only a constraint on product quality but also a reflection of the supplier's strength. As a participant in developing UHPC/GRC/GRG/GRP industry standards, Qinglong Group has always upheld an attitude of "meticulousness and the relentless pursuit of excellence", integrating performance assurance throughout its contract terms and full-chain services to provide customers with a worry-free cooperation experience from design to after-sales. Choosing a supplier with both technical strength and a sense of responsibility is the key to avoiding performance disputes and maximizing project value.