What Are the Key Steps in the Factory Prefabrication Stage of UHPC Curtain Wall Panel Production?

2026-02-03 16:47:40

Click:

The factory prefabrication of UHPC curtain wall panels is a highly industrialized process that integrates "digital design, precision manufacturing, and strict curing," and its quality directly determines the final architectural effect. Qinglong Group's prefabrication production process can be systematically broken down into six key steps: "detailed design and mold preparation, material proportioning and mixing, casting/spraying and compaction, curing and hardening, demolding and post-processing, and inspection and packaging," each of which requires precise control.

Step 1: Detailed design and mold preparation. This is the source of quality. Based on the building's BIM model, constructability analysis is carried out, panel joints are rationally divided, embedded parts and connection nodes are designed, and 3D data for CNC machining of molds is generated. The machining precision of the molds (usually steel or high-precision resin molds) must reach ±0.5mm. This stage determines the geometric accuracy and the foundation of the panel's appearance.

Step 2: Material proportioning and mixing. At the automatically controlled batching plant, raw materials such as cement, silica fume, quartz sand, steel fibers, and admixtures are weighed according to precise proportions. A high-speed shear mixer is used to blend them following a strict feeding sequence and mixing time, ensuring the fibers are evenly dispersed without clumping and that the mixture has good flowability and cohesion. This step is the core of achieving UHPC performance.

Steps 3 to 6: Forming, curing, and post-processing. The mixture is cast into the mold and compacted by vibration or vacuum-assisted air extraction. It is then sent into a curing kiln to follow a preset heating–constant temperature–cooling steam curing curve (e.g., curing at 80°C for 12 hours), which is key to activating UHPC strength. After demolding, edge and corner grinding, surface treatment (such as pickling, sandblasting, and coating), and inspection of embedded parts and dimensions are carried out. Qualified products are custom packaged and stored in the warehouse. The entire process is managed with an ERP system to ensure the traceability of every panel. This standardized factory prefabrication process is the fundamental guarantee of high quality, high performance, and rapid delivery for UHPC curtain walls.

0
What Are the Key Steps in the Factory Prefabrication Stage of UHPC Curtain Wall Panel Production?
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.