Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!
UHPC & GRC Complex Architecture Manufacturing
A Global Benchmark in Smart Architectural Fabrication
2026-01-30 14:27:54
Click:
GRC installation is the key link connecting production and application, requiring comprehensive technical safeguard measures to ensure installation quality and safety. Qinglong Group has established a full-process installation assurance system covering "preliminary preparation, process control, and acceptance evaluation." In the Shenzhen Yirui Biotechnology Building project, this assurance system ensured the precise installation of 3,000 square meters of curtain wall panels, achieving the "zero-error" installation goal.
BIM technology-guided installation is a modern safeguard measure. Qinglong conducts installation rehearsals using BIM models, optimizing installation sequences and hoisting paths to identify and resolve potential problems in advance. Installation positioning drawings are also generated for each panel to guide precise on-site layout. This digital installation guidance ensures the smooth implementation of complex projects.
A professional installation team and technical briefings form the foundation of quality. All of Qinglong's installation personnel are certified for their roles and regularly receive technical training and safety education. Detailed technical briefings are conducted before each project begins, ensuring construction personnel fully understand the technical requirements and precautions. For special process stages, technical staff are also arranged to provide on-site demonstration and guidance.
Well-equipped installation equipment and tools provide hardware assurance. Qinglong is equipped with professional hoisting equipment, measuring instruments, and installation tools, which are regularly calibrated and maintained. For special components, dedicated installation fixtures are also developed to ensure a safe and reliable installation process. This hardware investment reflects the comprehensive strength of a professional manufacturer.
A strict quality acceptance system is the final safeguard. Qinglong implements the "three-inspection system": self-inspection by construction crews, patrol inspection by project managers, and dedicated inspection by the company's Quality and Safety Department. Each acceptance stage has clear standards and records, ensuring quality issues are identified and rectified promptly. This strict quality control ensures the final installation result.