Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
  • عربي
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

Do UHPC Manufacturers Have Many Bridge Project Cooperation Cases? New Chapter in Bridge Construction and Engineering Proof from Qinglong Group

2026-01-29 13:22:48

Click:

In the field of bridge engineering, the application of UHPC is moving from "pilot trials" toward "large-scale adoption." The number and quality of a manufacturer's project cases directly reflect its technical maturity and engineering experience in this field. Qinglong Group has been deeply involved in a number of representative UHPC bridge projects, including "UHPC Bridge Deck Pavement for the Qingxi Bridge in Guangdong," "UHPC-NC Composite Girders for a Sea-Crossing Bridge in Shenzhen," and "UHPC Reinforcement Project for a Deteriorated Bridge on a Yunnan Expressway." These cases cover a range of scenarios, including lightweight design of new bridges, steel bridge deck pavement, and repair and reinforcement of old bridges, demonstrating our full-cycle service capability in the bridge sector, from material supply to structural design consulting. Bridge cases are hard proof of UHPC's structural performance.

Lightweight Innovation Collaboration for New Long-Span Bridges

In a composite girder bridge project on an expressway in Guangdong, we collaborated with the design institute to adopt a UHPC-NC composite structure, reducing the main girder's self-weight by 25% and increasing the span by 15%. We not only supplied materials but also participated in the design of connection details and the development of construction methods. The project has become a benchmark project in the region, demonstrating the enormous technical and economic value of UHPC in new bridge construction.

Durability Solution Collaboration for Steel Bridge Deck Pavement Renovation

In the pavement renovation of several large steel bridge decks in southern China, Qinglong UHPC served as a 45mm-thick ultra-thin wear-resistant pavement layer, replacing traditional asphalt concrete. Working with the owners and maintenance units, we solved key technical challenges such as the bonding of UHPC to steel bridge decks, skid resistance, and crack resistance. After the pavement was completed, the deck surface was smooth and durable, with the maintenance cycle expected to be extended more than threefold—an outcome highly praised by the owners.

Rapid Construction Collaboration for Old Bridge Repair and Reinforcement

In the reinforcement of a T-girder bridge in Yunnan that had been in service for over 30 years, we used the UHPC layer section enlargement method, completing the main reinforcement work in only 15 days and greatly shortening the traffic disruption period. Through close collaboration among inspection, design, and construction parties, the UHPC materials we supplied offered high early strength and strong bonding, raising the bridge's load rating by two levels after reinforcement. This highly efficient collaboration model has been well received by municipal administrative departments.

Forward-Looking Collaboration in Research and Standard Setting

We collaborate with institutions such as the Research Institute of Highway of the Ministry of Transport and Tongji University, participating in the drafting of standards such as the "Technical Guide for the Application of UHPC in Bridges," and undertaking the construction of trial sections in actual projects. This industry-academia-research-application collaboration has promoted the standardization and popularization of UHPC bridge technology in China.

Therefore, collaboration cases from bridge projects highlight a manufacturer's professional depth in the field of structural engineering. Backed by solid engineering practice, Qinglong Group is becoming a key participant in China's UHPC bridge construction.

0
Do UHPC Manufacturers Have Many Bridge Project Cooperation Cases? New Chapter in Bridge Construction and Engineering Proof from Qinglong Group
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.