The delivery time of a GRC manufacturer is not a fixed value, but a dynamic process formed by the overlap of five stages—"design cycle, mold making, production scheduling, curing time, and logistics and transportation"—usually ranging between 30 and 90 days. Based on standardized production processes and a project database, Qinglong Group manages delivery times in tiers: for standard flat panels with existing molds (e.g., 3000×1200mm), the delivery time can be shortened to 15-20 days; for conventional shaped components requiring new molds, the cycle is 30-45 days; for complex double-curved, perforated, or oversized special-shaped components, 60-90 days are required. In the Shenzhen Pingshan High-tech Zone Comprehensive Service Center project, through early BIM detailing, parallel mold making, and rolling production scheduling, we compressed the delivery time from the original 75 days to 50 days, safeguarding the project's key milestones. Scientific management is the core of shortening delivery time.
Design detailing and confirmation: this stage is prone to delays caused by repeated communication. We use a BIM collaboration platform to confirm details online with clients and designers, reducing the average confirmation time from 2 weeks to 5 working days. Mold making: this is a rigid time bottleneck. Through three-shift operations at CNC machining centers, we keep the steel mold making cycle within 15-25 days. Production and curing: the standard curing cycle takes 7-14 days. We use a steam curing process to shorten the time to reach target strength to 3 days.
We have established a "standard component library" covering 80% of commonly used panel types, which can be called upon for production at any time. We promote "modular design" to convert non-standard parts into combinations of standard modules, reducing the number of molds. We implement a "rolling production plan" that combines similar components from multiple projects for joint production, improving efficiency. In the Nanning New Media Center project, modular design reduced the number of molds by 40% and shortened the delivery time by 30%.
Through a project collaboration system, we share real-time progress of the design, mold, production, and logistics stages with clients, and any delay risk is flagged with an advance warning. Clients can check their order status at any time, just like tracking an express delivery. This transparency eliminates uncertainty and makes it easier for clients to arrange subsequent processes.
Therefore, a reasonable delivery time is a reflection of a manufacturer's overall capabilities. Through process optimization and technological innovation, Qinglong Group continuously improves delivery efficiency while ensuring quality, becoming a reliable guarantee for clients' project schedules.