Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
  • عربي
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

What to Pay Attention to in UHPC Construction? Key Steps and Qinglong Group's Precision Construction Guide

2026-01-28 14:24:48

Click:

UHPC construction requires close attention to five key aspects: mix proportion accuracy, mixing uniformity, pouring compaction, timely curing, and joint treatment—any oversight may affect the final strength and durability. Drawing on experience from hundreds of projects, Qinglong Group has distilled the core construction precautions: weigh materials strictly according to the design mix with error controlled within ±0.5%; use a forced-action mixer to ensure uniform fiber distribution; vibrate thoroughly during pouring to expel air bubbles; begin moist curing immediately after final setting and maintain it for no less than 7 days; clean joints thoroughly and use specialized sealing materials. In the Shenzhen Yirui project, we monitored these key points throughout the whole process, keeping the curtain wall system intact for ten years. Details determine success or failure.

Raw Material Batching and Mixing Are the Foundation of Quality

Each batch requires precise measurement of cement, aggregates, fibers, admixtures, and water. An automatic batching system is recommended. Insufficient mixing time easily causes clumping, while excessive mixing may introduce too many air bubbles. Qinglong dry-mix simplifies on-site operations and reduces errors.

Pouring and Vibration Ensure Dense, Defect-Free Results

UHPC has poor flowability and requires high-frequency vibration (frequency 10,000-12,000 times/minute) to help it flow and compact, but avoid over-vibration and segregation. For complex molds, attachable vibrators can be used. During spraying, control the nozzle angle and distance to ensure uniform thickness.

Early Curing for Crack Prevention Is the Top Priority

UHPC has high autogenous shrinkage and loses water quickly. Before its surface dries (after final setting), plastic sheeting or a curing compound must be applied immediately, keeping it moist for at least 7 days. When the temperature is below 5°C or above 35°C, heating or cooling measures are required. Steam curing (80°C × 12h) can significantly improve early strength.

Joint and Anchorage Treatment Affects Long-Term Performance

The width of joints between panels must allow for temperature deformation (typically 8-12mm); after thorough cleaning, fill with high-elasticity sealant (movement capability ≥25%). Embedded parts must be installed in accurate positions, with sufficient anchorage depth (generally ≥40mm), and treated for rust prevention.

Following these precautions yields twice the results with half the effort. Qinglong Group provides all-round guidance from planning to on-site work, helping ensure project success.

0
What to Pay Attention to in UHPC Construction? Key Steps and Qinglong Group's Precision Construction Guide
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.