How Much Does the Production Cycle of UHPC Components Differ from Traditional Concrete Components?

2026-01-24 15:02:00

Click:

The production cycle of UHPC components differs significantly from that of traditional concrete components, mainly in three key areas: "curing time, formwork turnover, and installation efficiency." Overall, the UHPC cycle can be shortened by 30-50%. Qinglong Group data comparison: standard UHPC panels (steam-cured) require 1-2 days from casting to demolding, with total curing of 3-7 days; traditional C50 concrete requires 7 days of natural curing before demolding and 28 days to reach full strength. In the Wuhan Hanxiu Theater project, UHPC curtain wall panels used steam curing (strength achieved in 24 hours), with formwork turning over once daily, shortening the overall production and installation cycle by 40 days compared to the original stone scheme. The cycle difference stems from material properties and process innovation—UHPC achieves efficient production through high strength and early strength gain.

Curing Time Greatly Reduced

UHPC steam-cured for 24 hours can reach a strength of over 50MPa, sufficient for demolding; natural curing reaches 70% in 3 days. Traditional concrete reaches only 70% strength at 7 days and 100% at 28 days. Qinglong Group's intelligent curing kilns enable rapid batch processing, improving efficiency 3-fold.

Faster Formwork Turnover Accelerates Construction Pace

UHPC has high early strength, allowing formwork to be quickly removed and reused. Traditional concrete formwork occupies molds for long periods. In the Shenzhen Yirui project, we used steel formwork, achieving a daily output of 200㎡ of UHPC panels, while concrete panels require a 3-day cycle.

Installation Efficiency Benefits from Lightweight, High-Strength Properties

UHPC components are lightweight (thickness can be as thin as 15mm), quick to hoist, and require fewer connection joints. Traditional concrete components are heavy and slow to install. Qinglong UHPC panels achieve an installation efficiency of 50㎡ per person-day, twice that of concrete.

UHPC's cycle advantages are particularly prominent in prefabricated buildings. Qinglong Group further shortens overall construction schedules through standardized design and automated production, creating time value for customers.

0
How Much Does the Production Cycle of UHPC Components Differ from Traditional Concrete Components?
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.