The delivery lead time of UHPC products is a variable affected by multiple factors—order complexity, production batch size, process difficulty, and supply chain conditions. Regular orders take 30-45 days, while complex custom-shaped components may require 60-75 days. Through 28 years of lean manufacturing practice, Qinglong Group has established an efficient delivery system of "order grading + concurrent engineering + intelligent scheduling", compressing the lead time for standard flat panel orders to 25-30 days and keeping double-curved panels within 40-50 days. In the large commercial project of Nanning Wuxiang China Resources MixC, facing an order of thousands of custom-shaped panels, we kept the overall lead time within the contractually agreed 60 days through strategies such as pre-fabricated molds, optimized steam curing, and phased shipment, achieving zero-delay delivery. Lead time management reflects a manufacturer's whole-process coordination capability—from sales, technology, and production to logistics—as well as its respect for customer commitments.
After receiving an order, quickly completing the technical review and detailed drawing work is the first step in shortening the lead time. Qinglong Group requires order review to be completed within 24 hours and detailed drawings for complex shapes to be issued within 72 hours. Using BIM technology for virtual pre-assembly resolves design conflicts in advance and avoids modifications and rework during production, saving at least 5-10 days.
By introducing advanced processes such as high-speed mixing, vacuum forming, and steam curing, Qinglong Group has shortened the natural curing period of UHPC from 7 days to 2-3 days, which is key to improving delivery speed. At the same time, cellular and modular production is adopted to reduce mold change and adjustment time. Lean manufacturing minimizes non-value-added time.
Establish strategic partnerships with reliable logistics providers and plan transport routes in advance. For urgent orders, air freight or dedicated direct delivery vehicles are activated. Qinglong Group has built a nationwide logistics network to ensure that finished products are transported to project sites quickly and safely. An efficient delivery system must be efficient across the entire chain.