Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!
UHPC & GRC Complex Architecture Manufacturing
A Global Benchmark in Smart Architectural Fabrication
2026-01-23 16:28:48
Click:
The after-sales response time of a UHPC manufacturer is a key indicator for measuring service efficiency. Quality manufacturers should establish an efficient mechanism featuring "tiered response, regional coverage, and intelligent dispatching." Based on data analysis of 2,000+ service cases, Qinglong Group has established the after-sales response standard of "2-hour response, 24-hour solution, 72-hour on-site arrival," and reduced the average actual response time to 1.2 hours through its intelligent dispatching system. In a sudden repair request for the Shenzhen Yirui Biotechnology Building project, we achieved industry-leading speed through online order taking via APP, intelligent dispatching, and regional coordination—technicians arrived on site within 45 minutes, completed the assessment within 2 hours, and started construction within 8 hours. Response time is not just a promised number; it is a direct reflection of systematic service capability.
Qinglong Group has developed an intelligent after-sales service dispatching platform that integrates GIS positioning, online diagnosis, and automatic order dispatching. After customers submit service requests through the WeChat mini program, the system automatically matches the nearest service outlet and the appropriate professional technicians, and plans the optimal route. In an emergency service for a project in Dongguan, it took only 18 minutes from request submission to engineer departure, tripling the efficiency compared with the traditional telephone communication model.
We have established 16 regional technical centers nationwide, each equipped with 2-3 service teams and stocked with commonly used spare parts and tools. Key regions such as South China, East China, and North China achieve full coverage of prefecture-level cities, with an average service radius of less than 150 kilometers. The Nanning Wuxiang China Resources MixC One project enjoys "half-hour service circle" treatment during the warranty period, with any issue receiving an immediate response.
A three-tier response mechanism has been established: general inquiries are answered by phone within 2 hours; technical issues receive remote support within 24 hours; and urgent issues are handled on site within 72 hours. During the post-typhoon inspection at the Hainan International Convention and Exhibition Center, we activated the emergency response plan, formed a dedicated task team within 2 hours, and completed a comprehensive inspection within 24 hours, ensuring that potential risks were identified and addressed in a timely manner.
Through the development of a digital, networked, and intelligent response system, Qinglong Group has turned rapid response from a goal into reality, providing customers with truly efficient service assurance.