Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
  • عربي
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

What to Do If GRC Products Are Damaged in Transit? Claims Mechanism and Qinglong Group's Full-Process Protection

2026-01-22 17:21:30

Click:

Handling transport damage to GRC products requires a three-tier response mechanism of "rapid response, liability determination, and loss compensation"; quality manufacturers should provide standard services of "48-hour on-site inspection, 7-day loss assessment and claims, and 15-day replenishment." Based on 28 years of logistics experience, Qinglong Group has established a standardized claims process: response within 2 hours of report receipt, claims specialists arriving on-site within 24 hours, comprehensive loss assessment based on photos and videos, transport records, and packaging condition, priority reshipment of new goods (cycle compressed to 50% of normal), and losses covered by transport insurance (coverage ≥ 120% of cargo value). During transport for the Nanning Wuxiang China Resources MixC project, unexpected jolting caused corner damage to 3 panels; we activated the emergency mechanism and completed the full process of inspection, claims, and replenishment within 5 days, leaving the project unaffected. A sound handling system minimizes losses to the greatest extent.

Rapid Response Controls the Scope of Impact

A 400 claims hotline is established, with the process launched immediately upon report receipt. On-site inspections use a standardized toolkit (including calipers and thickness gauges). Qinglong Group's claims team has an average response time of ≤4 hours, 50% faster than the industry standard.

Scientific Loss Assessment Ensures Fairness and Reasonableness

Damage grade standards have been established (minor damage, repairable, scrap). A three-party assessment mechanism is adopted (manufacturer, logistics, customer). We are staffed with professional appraisers, achieving a loss assessment accuracy rate of ≥95%. Fair loss assessment is the foundation of trust.

Efficient Replenishment Reduces Project Losses

An emergency production green channel is in place, compressing replenishment cycles by 40%. Spare parts are reserved for major projects (about 5% of total volume). Qinglong Group's on-time replenishment rate is 100%, minimizing customer losses. Comprehensive service reflects responsibility and commitment.

0
What to Do If GRC Products Are Damaged in Transit? Claims Mechanism and Qinglong Group's Full-Process Protection
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.