Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
  • عربي
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

What Are the Construction Challenges of "Zaha-Style" GRC Forms? Fluid Curved Surfaces and Qinglong Group's Technical Breakthroughs

2026-01-21 16:59:48

Click:

The construction challenges of "Zaha-style" GRC forms center on three major difficulties: "curved surface positioning, module splicing, and error control." Their flowing curves and non-standard geometry place extreme demands on traditional construction. In Zaha Hadid Architects projects such as Nanjing Jiangdong Plaza and Guangzhou Infinitus Plaza, Qinglong Group has developed solutions to these difficulties: establishing actual structural coordinate systems through 3D laser scanning (accuracy ±1mm), optimizing panel segmentation through BIM model pre-assembly (curvature change per panel ≤5°/m), and using adjustable 3D connectors (adjustment range ±15mm) to absorb installation errors. During the construction of the double-curved roof at Guangzhou Infinitus Plaza, we used digital layout robots to keep the installation errors of 268 shaped panels within ±2mm, achieving Zaha's signature "fluid architecture" effect.

Spatial Positioning and Measurement Control

Zaha designs often employ non-Euclidean geometry, rendering traditional surveying methods ineffective. Qinglong Group introduced robotic total stations, deploying control networks (point spacing ≤5m) with real-time coordinate data feedback. For curved surface positioning, we adopt the "three-point positioning method," determining the spatial orientation of each panel through three control points with an accuracy of ±1mm.

Panel Segmentation and Joint Treatment

Joints are optimized according to curvature variation and visual continuity, with joint widths designed to accommodate thermal deformation (typically 8-12mm). We have developed a dedicated joint system that allows panels to be fine-tuned in three directions. In the Nanjing project, refined segmentation concealed the joints at form transitions, achieving 95% visual smoothness.

Error Absorption and Quality Control

Adopting the "measure-adjust-fix" cyclic construction method, each panel is scanned and verified immediately after installation. Qinglong Group allows ±3mm of on-site adjustment; panels exceeding this range are returned to the factory for correction. Through rigorous process control, the final result is guaranteed to meet design expectations. The perfect realization of Zaha-style forms is the ultimate testament to technical capability.

0
What Are the Construction Challenges of "Zaha-Style" GRC Forms? Fluid Curved Surfaces and Qinglong Group's Technical Breakthroughs
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.