Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
  • عربي
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

Is BIM Technology Application Capability Important for UHPC Manufacturers? Digital Design and Qinglong Group's Intelligent Construction Practices

2026-01-21 16:38:06

Click:

An UHPC manufacturer's BIM application capability directly determines the precision and efficiency of complex project delivery, and is an important yardstick of a company's technical strength. Qinglong Group has deeply integrated BIM technology into the entire process of "scheme optimization, mold design, production control, and installation guidance." In the Wuhan Han Show Theater project with 9,000 double-curved panels, BIM models detected and resolved 137 design conflicts in advance, mold machining precision was raised to ±0.1mm, and installation errors were controlled within ±2mm. BIM is not only a 3D modeling tool but also a data bridge connecting design and manufacturing, effectively reducing rework, saving costs, and improving quality.

Value Creation in the Design Phase

Parametric design automatically optimizes panel segmentation and reduces the number of special-shaped components. In the Shenzhen Yirui project, BIM optimization increased material utilization by 15% and reduced the waste rate to below 3%. Digital design achieves "what you see is what you get."

Precision Control in the Production Phase

BIM models directly generate CNC machining code, realizing "design as production." In the fabrication of wave panels for the Hainan Convention and Exhibition Center, 3D scanning was used to verify product precision, raising the pass rate to 99.5%. BIM ensures consistency between the virtual and the real.

Data Support in the Operation and Maintenance Phase

The delivered BIM model serves as a digital asset supporting later maintenance. In the Nanning Wuxiang China Resources project, BIM models were used for emergency drills, improving management efficiency. BIM capability reflects a manufacturer's comprehensive strength.

0
Is BIM Technology Application Capability Important for UHPC Manufacturers? Digital Design and Qinglong Group's Intelligent Construction Practices
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.