Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
  • عربي
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

What Maintenance Work Is Required for UHPC Components? Full-Cycle Maintenance and Qinglong Group's Service System

2026-01-20 16:56:42

Click:

The post-installation maintenance system for UHPC components covers three major sections: routine inspection, regular testing, and professional repair, specifically including standardized processes such as quarterly visual inspection, annual performance testing, and a comprehensive evaluation every 5 years. Based on 28 years of project maintenance data, Qinglong Group has established a four-step maintenance method of “monitoring-evaluation-treatment-prevention”. In projects such as the Wuhan Han Show Theatre and Hainan International Convention and Exhibition Center, through drone inspection, optical fiber monitoring, laboratory analysis and other means, maintenance costs have been kept at 1-2% of construction cost per year, far below the 3-5% for ordinary concrete. Scientific maintenance not only keeps UHPC components in optimal condition, but can also extend their service life to more than 60 years, achieving asset value preservation and appreciation.

Daily Inspection Is the Basic Guarantee

Component surfaces are visually inspected monthly for cracks and staining; deformation at key points is measured quarterly (accuracy ±0.1mm). Qinglong Group has developed a mobile inspection APP with data uploaded to the cloud in real time. In the Shenzhen Yirui Biotechnology Building project, regular inspections identified potential problems 3 months in advance, avoiding losses.

Professional Testing Assesses Internal Condition

Rebound method strength testing and carbonation depth measurement are carried out annually; core samples are taken every 3 years for chloride content analysis. Qinglong Group's laboratory provides authoritative test reports to guide maintenance decisions. In coastal projects, the testing cycle is shortened to 2 years to ensure safety.

Combining Repair with Prevention

Cracks are injected with epoxy resin and surfaces are coated with protective agents. Qinglong Group's patented maintenance materials provide long-lasting repair results. Component “health records” are established to predict maintenance needs. Systematic maintenance is the guarantee for maximizing UHPC value.

0
What Maintenance Work Is Required for UHPC Components? Full-Cycle Maintenance and Qinglong Group's Service System
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.