Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!
UHPC & GRC Complex Architecture Manufacturing
A Global Benchmark in Smart Architectural Fabrication
2026-01-20 16:07:06
Click:
Preventing edge and corner damage during UHPC component transportation requires a comprehensive solution combining "customized packaging + cushioning design + standardized loading/unloading". Based on 28 years of logistics experience, Qinglong Group has established a three-tier protection standard: Grade A (edge wrapping), Grade B (frame support), and Grade C (full crating): rubber corner protectors (thickness ≥20mm) are installed at edges and corners, pearl cotton separators (density ≥20kg/m³) are placed between panels, and EVA foam (thickness ≥50mm) is lined inside frame wooden crates. During the transportation of roof panels for the Hainan International Convention and Exhibition Center, 12,000 square meters of components were shipped over 2,000 kilometers with a damage rate reduced to below 0.1%, significantly lowering project costs.
Corner protectors are made of recycled rubber, offering good elasticity and eco-friendliness. Frame wooden crates are made of pine (moisture content ≤18%), with interior mold cavities customized to component shapes. We optimize packaging structures through simulation analysis.
Components are placed vertically with a tilt angle ≤15°, and straps are fitted with protective sleeves to avoid pressure marks. Transport vehicles have good shock absorption systems with speed ≤80km/h. Qinglong Group trains professional loading/unloading teams.
Real-time GPS monitoring with anomaly alerts. Transportation insurance is purchased for worry-free delivery throughout. A scientific logistics plan is the guarantee of project success.