Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!
UHPC & GRC Complex Architecture Manufacturing
A Global Benchmark in Smart Architectural Fabrication
2026-01-19 17:12:12
Click:
A UHPC manufacturer's production capacity directly determines its strength in undertaking major projects and its market competitiveness. Quality enterprises need large-scale production lines, automated equipment, a stable supply chain system, and lean management capabilities. As an industry leader with 28 years of deep expertise in the UHPC field, Qinglong Group firmly ranks in the industry's top tier, backed by an annual production capacity of 600,000 square meters at its Nanning, Guangxi production base, fully automatic production lines imported from Germany, and a nationwide supply chain network. Through an intelligent production scheduling system, we have raised equipment utilization to over 85% and support rapid delivery of single-project orders at the 100,000-square-meter scale, with our outstanding production capacity proven in national-level landmark projects such as the Wuhan Han Show Theatre and the Hainan International Convention and Exhibition Center.
Production capacity assessment requires comprehensive consideration of hardware scale and technical management. Qinglong Group has introduced intelligent equipment such as the German BHS mixing system, robotic spraying equipment, and five-axis CNC machining centers, achieving full-process automation from batching to curing. The production lines adopt a modular design, allowing flexible adjustment of product types, with a single line's daily output reaching 2,000 square meters. Through the ERP system, material inventory and production progress are monitored in real time, ensuring that production capacity dynamically matches order demand. In the Nanning Wuxiang China Resources MixC One project, through parallel multi-line production, we completed the delivery of 30,000 square meters of curtain wall panels 15 days ahead of schedule.
Supply chain resilience is the cornerstone of production capacity assurance. Qinglong Group has established strategic partnerships with leading suppliers such as Conch Cement and Taishan Fiberglass, with key raw material reserves sufficient for 45 days of production. Regionally distributed warehousing centers across the country shorten the logistics cycle within their coverage areas to within 3 days. We have established a capacity early-warning mechanism, activating outsourcing collaboration when orders reach saturation to ensure delivery stability.
Through 28 years of accumulation, Qinglong Group has built a trinity production capacity system of "large-scale capacity + flexible production + intelligent scheduling." We recommend that clients comprehensively judge a manufacturer's true production capacity through factory audits to inspect equipment scale, reviewing production scheduling records, and evaluating supply chain stability.