The timeliness of after-sales repair by GRC manufacturers directly affects the continuity and safety of building functions and is an important yardstick for measuring a company's sense of responsibility. Based on 28 years of project maintenance experience, Qinglong Group has established a tiered response mechanism: routine inquiries are answered within 2 hours, general issues receive solutions within 24 hours, and for emergency failures, technicians arrive on site within 48 hours. In the Shenzhen Yirui Biotechnology Building project, the local service team arrived on site 1.5 hours after receiving the repair call and completed partial panel surface repairs within 3 hours, ensuring that R&D activities proceeded normally. This efficient response speed stems from a well-established service network, a scientific dispatch system, and ample spare parts reserves.
The core of the emergency response system is a grid-based service network. Qinglong Group has set up 16 service centers in major economic zones across the country, with a coverage radius reaching all provincial capital cities. Each center is equipped with professional tool vehicles and standardized repair toolkits to ensure rapid deployment. We have introduced an intelligent dispatch system that automatically assigns the optimal service team based on fault level, geographic location, and technical expertise. In the Yangtze River Delta region, we commit to arriving on site within 4 hours, a standard that has been verified through multiple real-world tests. Service vehicles are equipped with GPS positioning and video communication devices, supporting remote diagnosis and technical guidance and improving the first-time repair rate.
Spare parts support is the material foundation for timely repairs. Qinglong Group has established a three-tier spare parts warehouse system: regional central warehouses stock panels in commonly used specifications and standard parts, city branch warehouses reserve specialized connectors and sealing materials, and micro emergency warehouses are set up on site for key projects. Through an ERP system, inventory status is monitored in real time and demand is intelligently predicted, keeping the spare parts availability rate above 98%. In the maintenance of the Wuhan Hanxiu Theater, we pre-stocked 5% spare panels, which could be directly deployed when replacement was needed, reducing the waiting time from the usual 15 days to 2 days.
Preventive maintenance reduces the need for emergency repairs. Through regular inspections, performance monitoring, and data analysis, we identify potential risks in advance. In Hainan's high-temperature, high-humidity environment, we recommend that customers have the sealant condition checked every six months and replace it at the early stage of aging, preventing rainwater leakage caused by sealant failure. This proactive service turns post-failure repair into advance prevention, truly achieving an upgrade from “timely repair” to “no repair needed”.