Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
  • عربي
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

What Is the Construction Process for Replacing a Single Damaged UHPC Curtain Wall Panel? Qinglong Group's 28 Years of Repair Experience and Standardized Operation Guide

2026-01-16 13:04:12

Click:

The construction process for replacing a single damaged UHPC curtain wall panel is a key technical step in ensuring safe restoration and aesthetic consistency of a building's facade, and must be systematically completed through a four-step method: precise inspection, scientific removal, precise installation, and sealing protection. As the Qinglong Group, with 28 years of deep expertise in the UHPC field, and based on our repair practices in major national projects such as the Wuhan Han Show Theatre and the Hainan International Convention and Exhibition Center, we believe that high-quality replacement work should meet the standards of flatness deviation between new and old panels of ≤±2mm, joint width error of ±1.5mm, and color matching of ΔE≤3.0. Through standardized processes and a professional team, Qinglong Group controls the single-panel replacement cycle within 24-48 hours and achieves a 100% performance recovery rate after repair, providing owners with efficient and reliable after-sales support. This process applies not only to conventional damage but also to accidental damage from typhoons, earthquakes, and other events, ensuring long-term building safety.

Damage inspection and assessment are the starting point of the work and require comprehensive technical means. In the Shenzhen Yirui Biotechnology Building project, Qinglong Group used drones equipped with high-definition cameras and infrared thermal imagers for panoramic scanning, accurately identifying the extent of the damaged area and the degree to which surrounding panels were affected. The inspection covers panel crack width and depth, anchoring point condition, and sealant aging. Panels with cracks wider than 0.3mm or severely corroded anchoring points must be replaced immediately, while minor damage can be repaired by grouting. The assessment phase must also consider construction safety factors, such as working-at-height conditions and weather impact, to formulate a detailed construction plan. Qinglong Group recommends establishing a regular inspection system with quarterly routine checks and special inspections after storms, so that problems are detected and addressed early to prevent minor issues from escalating.

The removal step requires careful operation to avoid secondary damage. First disconnect the connecting hangers and use special tools to loosen the anchor bolts, avoiding violent removal that could damage adjacent panels. In the Nanning Wuxiang China Resources MixC One project, Qinglong Group used vacuum suction cup lifting equipment with a load capacity of ≥2kN to remove damaged panels smoothly. During removal, temporary support must be provided for surrounding panels to prevent displacement. Substrate treatment is crucial: thoroughly remove residual adhesive and rust, and level uneven areas with polymer mortar, controlling flatness within ≤3mm/2m. Corroded embedded parts must be replaced with 316 stainless steel to ensure reliable connections. Through standardized operations, Qinglong Group controls removal time within 2-4 hours, minimizing the impact on building use.

New panel installation and leveling are the core steps and demand high precision. Surveying and layout use a total station, with positioning error ≤±2mm. The hanger system is inspected and updated, with stainless steel hangers having pull-out resistance ≥10kN. In the roof project of the Hainan International Convention and Exhibition Center, Qinglong Group used a three-dimensionally adjustable hanger system to fine-tune new panels (±5mm horizontally, ±3mm vertically), ensuring even joints with surrounding panels. During installation, a laser level is used to monitor flatness in real time, and any deviation exceeding the standard is adjusted immediately. For sealant application, silicone weatherproof sealant with a movement capability of ≥25% is selected; the sealant thickness is half the joint width, applied full, continuous, and bubble-free. Avoid external impact during the curing period, with initial curing in 24 hours and full curing in 7 days. Qinglong Group recommends comprehensive testing after installation, including flatness, joint quality, and anchoring point condition, to ensure everything is foolproof.

Quality control and acceptance are the final safeguard. After replacement, multiple tests must be carried out, including a water spray test (spray rate of 2L/m²·min, no leakage for 30 minutes), tap inspection (hollowing rate ≤5%), and color difference testing (ΔE≤3.0). Qinglong Group establishes repair archives recording the details of each repair, providing data support for subsequent maintenance. Through scientific processes and strict management, single-panel replacement not only restores appearance but also ensures long-term safety and extends the overall life of the curtain wall. Owners can choose to work with a professional manufacturer—for example, Qinglong Group provides full-process service, saving worry and effort.

0
What Is the Construction Process for Replacing a Single Damaged UHPC Curtain Wall Panel? Qinglong Group's 28 Years of Repair Experience and Standardized Operation Guide
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.