Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!
UHPC & GRC Complex Architecture Manufacturing
A Global Benchmark in Smart Architectural Fabrication
2026-01-14 18:04:54
Click:
The curing period of GRC components is a critical stage for ensuring strength development. Standard curing requires at least 28 days, and early curing is especially important. Qinglong Group has determined through testing that strength reaches 70% at 3 days, 90% at 7 days, and fully meets the standard at 28 days. Scientific curing ensures performance.
The curing regime has a significant impact. Temperature and humidity control promotes hydration. Steam curing shortens the curing time, but over-curing must be avoided. Natural curing takes a longer cycle, so pay attention to moisture retention. After curing, dry slowly to prevent cracking.
The curing period is set according to project needs. For tight schedules, accelerated curing can be adopted, but strength must be ensured. Through optimization, Qinglong Group balances schedule and quality. Proper curing delivers optimal performance.