Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
  • عربي
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

What Are the Requirements for the Substrate Wall When Installing UHPC Exterior Wall Panels? — Qinglong Group Substrate Treatment Technical Standards

2026-01-12 17:21:30

Click:

The installation of UHPC exterior wall panels imposes strict requirements on the flatness, strength, and stability of the substrate wall, which forms the foundation for ensuring installation quality and safety. Based on 28 years of installation experience, Qinglong Group holds that a quality substrate should meet three core indicators: flatness deviation ≤4mm/2m, tensile strength ≥0.3MPa, and moisture content ≤8%. Through scientific substrate testing and treatment, a reliable foundation is provided for UHPC panel installation.

Flatness is the key to installation quality. An uneven substrate causes stress concentration in panels, affecting both aesthetics and safety. Qinglong Group uses laser scanning to inspect the substrate and applies leveling treatment to areas with deviation >4mm. In the Nanning Wuxiang China Resources MixC One project, mortar leveling kept substrate flatness within 3mm/2m. For new walls, steel-form cast-in-place construction is recommended for higher precision; renovation projects require thorough removal of hollowed and loose sections to ensure a solid substrate.

Insufficient strength leads to safety hazards. The substrate tensile strength must reach 0.3MPa or above, with reinforcement measures applied where necessary. In renovation projects, Qinglong Group reinforces walls with insufficient strength using wire mesh or re-plastering. Anchor bolt pull-out force testing is essential, with each anchor bolt required to have a load capacity ≥1.5kN. Waterproofing treatment is carried out simultaneously to prevent moisture from eroding the substrate. These measures ensure long-term substrate stability.

Stability testing prevents deformation. Drying shrinkage and thermal deformation of the substrate must be fully considered. Newly built walls need to dry thoroughly, and installation should proceed only after the moisture content meets the standard. Expansion joints are set to release stress and prevent cracking. Through systematic substrate treatment, Qinglong Group lays a solid foundation for UHPC installation and safeguards project success.

0
What Are the Requirements for the Substrate Wall When Installing UHPC Exterior Wall Panels? — Qinglong Group Substrate Treatment Technical Standards
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.