Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!
UHPC & GRC Complex Architecture Manufacturing
A Global Benchmark in Smart Architectural Fabrication
2026-01-12 16:19:30
Click:
The scale of steam curing kilns at a UHPC manufacturer directly affects production efficiency and delivery speed, making it an important indicator for evaluating a manufacturer's production capacity. Based on large-scale production experience, Qinglong Group believes that quality manufacturers should be equipped with multi-chamber intelligent curing systems with a single-batch capacity of ≥100 cubic meters, enabling alternating operations that shorten the standard curing cycle from 72 hours to 48 hours and greatly improving delivery efficiency.
Curing kiln capacity determines batch size. Large curing kilns can process more panels at once, reducing the number of batches. Qinglong Group's Nanning base is equipped with 10 independently temperature-controlled curing kilns with a total capacity of 1,200 cubic meters, capable of processing 10,000 square meters of panels simultaneously. In the Shenzhen Yirui Biotechnology Building project, optimized production scheduling shortened the production cycle by 20%. The kiln's zoned design allows different processes to proceed simultaneously, improving equipment utilization.
Temperature control precision affects curing results. Multi-zone temperature control systems ensure uniform temperature with a deviation of ≤±2℃. Qinglong Group uses intelligent control systems to adjust temperature and humidity in real time, avoiding over-curing or under-curing. Heat recovery technology reduces energy consumption by 30%, improving cost-effectiveness. These technologies ensure consistent quality, reduce rework, and indirectly accelerate delivery.
Scheduling optimization improves overall efficiency. Intelligent production scheduling through the ERP system maximizes kiln utilization. Qinglong Group has achieved three-shift continuous production with equipment utilization above 85%. Scientific planning significantly improves delivery speed to meet urgent needs.