What Are the Key Steps in the Factory Precast Stage of UHPC Curtain Wall Panel Production?

2026-01-10 17:02:54

Click:

Factory prefabrication of UHPC curtain wall panels is the core link in quality assurance, comprising five major steps: batching preparation, mold preparation, pouring and forming, curing and hardening, and inspection and packaging. Through 28 years of production optimization, Qinglong Group has controlled the prefabrication cycle to 7-10 days and raised the product pass rate to over 99.5%.

Batching preparation is the foundation of quality. Precision control of raw materials is critical: the weighing error for cement and silica fume is ≤±0.5%, and for water reducer ≤±0.1%. Qinglong Group adopts a fully automatic batching system with the water-binder ratio controlled at 0.20-0.22 to ensure workability and strength. The uniformity of fiber addition affects the reinforcement effect; robotic spraying ensures a fiber volume content of 2%-3% with distribution uniformity ≥95%. In the Shenzhen Pingshan High-tech Zone project, this precise batching kept the strength variation coefficient of panels within 5%.

Pouring and forming determine component precision. Mold temperature is controlled at 20±5°C, and the release agent is applied evenly. During pouring, layered feeding is adopted, with each layer thickness ≤200mm, vibration frequency at 50-60Hz, and duration of 30-45 seconds. In producing the wave panels for the Hainan International Convention and Exhibition Center, Qinglong Group used vibrating tables combined with attached vibrators to ensure compaction in areas with complex shapes. The vacuum dewatering process further improved compactness, reducing porosity to below 2%.

Curing and hardening are key to performance. Steam curing regime: temperature rise over 2h to 60°C, constant temperature for 24h, and cooling over 3h. Qinglong Group monitors the curing process through a BIM system, with temperature fluctuation ≤±2°C and humidity ≥95%. After curing, component strength reaches over 70% of the 28-day strength. Inspection covers dimensional deviation (≤±2mm), flatness (≤3mm/2m), and strength (≥100MPa); only qualified products may leave the factory. This standardized prefabrication ensures consistent product quality.

0
What Are the Key Steps in the Factory Precast Stage of UHPC Curtain Wall Panel Production?
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.