The delivery lead time of UHPC products is a critical factor in project schedule control, directly affecting the overall project timeline. Based on 28 years of project management experience, Qinglong Group breaks the delivery lead time into three phases: production cycle, logistics time, and installation preparation. Standard orders typically have a delivery lead time of 30-45 days; the exact duration depends on order size, product complexity, and shipping distance.
The production cycle is the main component of the delivery lead time. The production cycle for standard UHPC panels is typically 15-20 days, covering mold preparation, raw material mixing, casting, and curing. Through process optimization, Qinglong Group keeps the production cycle for standard panels within 15 days. In the Wuhan Han Show Theater project, parallel operations and nighttime curing compressed the production cycle for 9,000 square meters of shaped panels to 25 days, delivering 5 days ahead of the original schedule.
Product complexity significantly affects delivery time. Flat panel products have shorter lead times, while special shapes such as double-curved and hollow-out panels require longer cycles due to complex processes. In the Shanghai Century Plaza translucent UHPC project, Qinglong Group specially optimized the production process for the light-guide rod embedding technique, keeping the delivery time within 40 days. For urgent orders, the cycle can be shortened by up to 30% through additional shifts and process optimization.
Logistics and transportation are an important part of lead time calculation. Depending on project distance, logistics time is typically 3-7 days. Qinglong Group has regional warehousing centers across the country, enabling delivery within 3 days for projects within 500 km. In the Hainan Changying Global 100 Theme Park project, optimized water-land combined transport kept the transportation time within 5 days. For oversized components, specialized transportation plans are adopted to ensure transport safety while maintaining timeliness.
The installation preparation phase should also be included in lead time planning. Qinglong Group recommends that customers carry out on-site preparation 7 days in advance, including surveying and setting out, base treatment, and so on. Through full-process cycle management, we ensure seamless coordination at every stage and provide customers with accurate delivery commitments.