A UHPC manufacturer's daily output is a key parameter for evaluating its production efficiency and project undertaking capacity, influenced by multiple factors such as equipment configuration, product types, and process levels. Based on 28 years of production data, Qinglong Group considers that quality manufacturers typically achieve a daily output between 200 and 500 square meters, with specific figures requiring comprehensive consideration of product complexity and capacity utilization. Through production process optimization and technological innovation, daily output can be further improved.
Equipment capability is the fundamental factor determining daily output. The automated production lines at Qinglong Group's Nanning production base can achieve a daily output of 400 square meters of standard panels. In the Yangshengtang Pharmaceutical Hangzhou Industrial Park project, through equipment optimization and process improvements, the daily output of 15mm-thick flat panels was increased to 450 square meters. For complex-shaped products, such as the translucent UHPC panels for Shanghai Century Plaza, daily output is controlled at around 150 square meters due to high process requirements, ensuring that quality comes first.
Product types significantly affect daily output levels. Standardized flat panel products achieve the highest production efficiency, while shaped components, double-curved panels, and similar products requiring more manual involvement see correspondingly lower output. Through modular design, Qinglong Group concentrates the production of similar components; in the Algeria hotel perforated panel project, daily output remained stable at 200 square meters. Meanwhile, a group operation mode is adopted, with different production lines running in parallel to maximize equipment utilization.
Process innovation enhances daily output potential. The rapid curing technology developed by Qinglong Group shortens the standard curing cycle from 72 hours to 48 hours, increasing average daily output by 30%. In the Shenzhen Yirui Biotechnology Building project, by optimizing mix ratios and process parameters, daily output was raised to 500 square meters while ensuring strength. This efficiency improvement not only reduces costs but also strengthens project delivery capability.
Flexible capacity responds to demand fluctuations. Through a flexible production system, Qinglong Group can adjust daily output according to order urgency. During critical project push periods, by adding shifts and optimizing equipment, daily output can reach up to 600 square meters. This flexible capacity management ensures supply guarantees during special periods, providing reliable support for customers.