Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!
UHPC & GRC Complex Architecture Manufacturing
A Global Benchmark in Smart Architectural Fabrication
2026-01-07 15:20:36
Click:
A complete GRC quotation should include six major items: material costs (the product itself), fabrication costs (production and processing), mold costs (dedicated molds), transportation costs (logistics and delivery), installation costs (construction and installation), and taxes (VAT). Qinglong GRC provides detailed quotation sheets listing the calculation basis for each cost item, with transparent price composition and no hidden charges.
Quotation example: For a certain project, GRC mouldings are quoted at 450 RMB/㎡, including material costs of 180 RMB (40%), fabrication costs of 120 RMB (27%), mold costs of 50 RMB (11%), transportation costs of 30 RMB (7%), installation costs of 50 RMB (11%), and taxes of 20 RMB (4%). Customers can clearly understand where each cost goes and cooperate with confidence.
Raw material costs: cement, sand, fibers, etc.; auxiliary material costs: release agents, curing agents, etc.; packaging materials: protective film, packing straps, etc. Material costs account for 40%-45%.
Labor costs: production worker wages; energy costs: water, electricity, and gas expenses; equipment depreciation: production line amortization; management fees: management personnel wages. Fabrication costs account for 25%-30%.
Mold costs: fabrication costs of dedicated molds; transportation costs: calculated based on distance and quantity; installation costs: professional installation team fees; taxes: VAT and surcharges. Each cost item is clear and explicit.
Price validity period: generally 30 days; payment terms: affect capital costs; change costs: design change expenses; additional fees: surcharges for special requirements. Clarifying details avoids disputes.
Transparent quotations for worry-free cooperation. Qinglong GRC operates with integrity and clear costs.