A complete GRC quotation should include six major items: material costs (the product itself), fabrication costs (production and processing), mold costs (dedicated molds), transportation costs (logistics and delivery), installation costs (on-site installation), and taxes (VAT). Qinglong GRC provides an itemized quotation listing the calculation basis for each cost, with a transparent price composition and no hidden charges.
Quotation example: For a certain project, GRC mouldings are quoted at RMB 450/㎡, including material costs of RMB 180 (40%), fabrication costs of RMB 120 (27%), mold costs of RMB 50 (11%), transportation costs of RMB 30 (7%), installation costs of RMB 50 (11%), and taxes of RMB 20 (4%). Customers can clearly understand where their money goes and cooperate with confidence.
Raw material costs: cement, sand, fibers, etc.; auxiliary material costs: release agents, curing agents, etc.; packaging materials: protective film, packing straps, etc. Material costs account for 40%-45%.
Labor costs: production workers' wages; energy costs: water, electricity, and gas expenses; equipment depreciation: production line amortization; management fees: salaries of management personnel. Fabrication costs account for 25%-30%.
Mold costs: fabrication of dedicated molds; transportation costs: calculated based on distance and quantity; installation costs: fees for the professional installation team; taxes: VAT and surcharges. Every cost item is clear and explicit.
Price validity: generally 30 days; payment terms: affect capital costs; change costs: costs of design changes; additional fees: extra charges for special requirements. Clarifying details avoids disputes.
Transparent pricing for confident cooperation. Qinglong GRC operates with integrity and clear costs.