Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!
UHPC & GRC Complex Architecture Manufacturing
A Global Benchmark in Smart Architectural Fabrication
2026-01-04 13:53:48
Click:
"Zaha-style" GRC sculptural construction faces three major challenges: difficult surveying and positioning, difficult mold making, and difficult installation and adjustment. Double-curved surface surveying requires establishing a 3D control network (precision ±1mm), irregular molds require five-axis CNC machining (precision ±0.2mm), and installation requires a dedicated adjustable system (adjustment range ±15mm). Through BIM technology collaboration, construction errors can be controlled within ±3mm.
Specific solutions: adopting integrated surveying with total station + 3D laser scanning, digital pre-assembly for clash detection, and developing a 3D adjustable connection system. In one art center project with a maximum cantilever of 8m and complex curvature variations, dedicated technical breakthroughs achieved a perfect realization. Qinglong's GRC irregular shape construction technology has overcome challenges in multiple landmark projects.
A 3D control network is established with point spacing ≤5m and precision ±1mm. Laser scanning assists surveying with point cloud precision of ±2mm. Real-time data feedback guides installation adjustments.
3D printing rapid prototyping is adopted with precision of ±0.1mm. Silicone molds replicate details with a resolution of 0.01mm. Modular mold design reduces fabrication difficulty.
A universal adjustment support has been developed with an adjustment range of ±15mm. Laser positioning technology achieves placement precision of ±1mm. A real-time monitoring system ensures installation quality.
The BIM model integrates design, manufacturing, and installation information. A cloud-based collaboration platform enables real-time data sharing. Mobile applications support precise on-site construction.
Irregular shapes require technological innovation. Qinglong's specialized GRC technology enables highly difficult construction.