How to Design the Lifting Scheme for Large UHPC Artistic Shapes? Lifting Technology for Large UHPC Components

2026-01-04 13:29:00

Click:

The lifting plan for large UHPC artistic shapes is specially designed based on component weight, dimensions, and site conditions. Lifting points are determined through calculation, with a quantity of ≥4 and a safety factor of ≥5. A spreader beam lifting system is adopted to control lifting stress at ≤1/5 of the material strength. The entire lifting process is monitored throughout to ensure safe placement.

Specific design parameters: the angle between the lifting ropes and the horizontal plane is ≥60°, and lifting point locations avoid the maximum bending moment zones. In one 10-ton sculpture lifting operation, an 8-point lifting scheme was adopted with a 200-ton crane, keeping lifting stress within 8MPa. The lifting simulation system developed by Qinglong UHPC can predict and resolve lifting challenges in advance, improving construction safety.

Lifting Point Design Calculation

Lifting point positions are determined through finite element analysis, avoiding stress concentration zones. The number of lifting points is ≥4, evenly distributed. The safety factor is ≥5, and ≥8 for critical components. Lifting process simulation is performed to optimize lifting point arrangement.

Lifting System Selection

For weights ≤5t, soft sling lifting is used; for 5–20t, spreader beam lifting is used; for >20t, dedicated lifting frames are used. Lifting equipment has a safety factor of ≥6 and undergoes regular non-destructive testing.

Stress Control Measures

Lifting stress is ≤1/5 of the material strength, and ≤1/8 for critical components. Buffer devices are installed to reduce dynamic load effects. Lifting speed is controlled at ≤0.5m/s to maintain stability.

Safety Monitoring System

Parameters such as lifting stress and deformation are monitored in real time. Multiple protection devices are installed to ensure absolute safety. Emergency plans are formulated to handle unexpected situations.

Lifting of large components requires special design. Through scientific calculation and strict control, safe and smooth lifting is ensured.

0
How to Design the Lifting Scheme for Large UHPC Artistic Shapes? Lifting Technology for Large UHPC Components
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.