How Long Is the Typical Mold Development Cycle for UHPC Shaped Components? Analysis of Qinglong's UHPC Mold Production Time

2026-01-04 13:07:18

Click:

The mold development cycle for UHPC shaped components is divided into three levels based on complexity: simple shapes (flat panels, single-curved surfaces) take 7-10 days, medium complexity (double-curved surfaces, shallow relief) takes 10-15 days, and complex shapes (deep relief, irregular structures) take 15-25 days. Mold fabrication uses a combined process of CNC machining (precision ±0.1mm) + manual finishing to ensure forming quality.

Specific time allocation: 3D data processing 1-2 days, CNC machining 3-8 days, manual finishing 2-5 days, mold trial and acceptance 1-2 days. In one large art installation mold project, parallel operations (design and material preparation running simultaneously) compressed the conventional 20-day cycle to 15 days. Qinglong UHPC has established a standardized mold library, enabling rapid delivery within 5 days for common shapes.

Simple Shape Mold Fabrication

Uses three-axis CNC machining, with 1 day of programming and 2-3 days of machining. The mold material is GRP (fibreglass), which is low-cost and quick to produce. Suitable for projects with small batches and simple shapes.

Medium Complexity Mold Development

Uses five-axis CNC machining, with 2 days of programming and 4-6 days of machining. The mold substrate is tooling board, surface-reinforced with epoxy resin. Suitable for most artistic shaping needs.

Complex Shape Mold Process

Adopts a combined process of 3D-printed rapid prototyping + silicone mold replication. The prototype is printed first (1-3 days), then the silicone mold is made (5-7 days), and finally the resin mold is cast. Suitable for extremely complex artistic shapes.

Mold Optimization Measures

Establishes a modular mold system, enabling mold reuse for the same shape series. Adopts rapid clamping technology to reduce mold changeover time. Shortens mold curing cycles through pretreatment processes.

Mold development is a critical step in UHPC shaping. Through scientific management and technological innovation, a balance between quality and efficiency can be achieved.

0
How Long Is the Typical Mold Development Cycle for UHPC Shaped Components? Analysis of Qinglong's UHPC Mold Production Time
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.