A UHPC procurement contract must clearly specify 18 key clauses, with the focus on: technical standards (implementing GB/T 31387), acceptance methods (third-party testing), delivery time (liquidated damages of 0.5%/day for delays), payment terms (30% advance payment), and quality assurance (5-year warranty). Contract annexes should include: technical specifications, fabrication drawings, and acceptance criteria.
Key clauses explained: technical standards must specify concrete indicators such as compressive strength ≥120MPa; acceptance must agree on the sampling ratio (one set per 1000㎡) and testing institution; delivery time should account for potential delay factors (such as severe weather); warranty scope should cover material defects and workmanship issues. Qinglong UHPC provides a standard contract template with standardized, fair clauses that protect the rights and interests of both parties.
The implemented standard should include its year designation (e.g., GB/T 31387-2015); technical indicators should be quantifiable and measurable; such clarity prevents disputes.
Price adjustment mechanism (adjustable when raw material prices fluctuate by ±10%); payment milestones tied to delivery; such reasonableness safeguards interests.
Liquidated damages of 0.5%/day for delayed delivery; deadlines for rectifying substandard quality; such clarity binds both parties.
Specifying the arbitration institution and location; such provisions resolve disputes efficiently.
Contract clauses need to be clear and specific. Qinglong UHPC's standardized contracts make for pleasant cooperation.