The reliability of delivery times is the touchstone for testing a GRC manufacturer's project management and supply chain coordination capabilities. Through 28 years of lean practice, Qinglong GRC has built a scientific fulfillment assurance system centered on "precise planning, dynamic control, and rapid response," achieving an industry-benchmark record of an on-time delivery rate exceeding 98.5% for five consecutive years.
In terms of fulfillment management, Qinglong adopts a digital management model with deep integration of ERP and MES systems. From the day an order is signed, it is broken down into key nodes such as design, procurement, production, quality inspection, and shipping, all incorporated into system monitoring. In an urgent project for a large transportation hub in Shanghai, design changes caused a two-week delay in the GRC drawings. The Qinglong project team immediately activated contingency plans: the design team worked in parallel to save time, the procurement department locked in key raw materials in advance based on forecasts, and the production department adjusted the production schedule to reserve capacity windows. Ultimately, through efficient compression and coordination of all downstream processes, the delayed schedule was miraculously recovered, with shipment achieved on the originally scheduled date.
Relying on the Advanced Planning and Scheduling (APS) system, a scientific and feasible master production plan is formulated by comprehensively considering equipment capacity, material supply, process routes, and order priorities. The plan achievement rate remains stable above 95%.
Strategic partnerships and a collaborative inventory (VMI) model have been established with core suppliers to ensure a stable supply of bulk raw materials. Safety stock for raw materials is maintained, and long-lead-time purchased materials are stocked in advance based on forecasts.
Real-time production data is collected through the MES system to monitor the production progress of every panel. A daily production meeting system has been established to quickly identify and handle anomalies affecting progress, ensuring daily plans are completed within the day.
A tiered early-warning mechanism has been established to anticipate risks that may affect delivery times (such as extreme weather or traffic control during major sporting events) and formulate contingency plans in advance. Cross-departmental emergency teams are organized to ensure rapid decision-making when unexpected issues arise.
Guaranteeing delivery times is a systematic endeavor that relies on comprehensive support from management, technology, and the supply chain. Qinglong GRC regards "honoring commitments" as the lifeline of the enterprise, becoming the most trusted partner of its clients when it comes to project schedules.