Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
  • عربي
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

Which UHPC Manufacturer Can Deliver on Time? An In-Depth Analysis of Qinglong's UHPC Contract Performance Assurance System

2025-12-24 14:51:48

Click:

On-time delivery capability is a key indicator for assessing the overall strength of a UHPC manufacturer. Through 28 years of project management practice, Qinglong UHPC has established a scientific performance assurance system, with an on-time delivery rate consistently above 98.5% for five consecutive years.

In terms of production planning management, Qinglong adopts an Advanced Planning and Scheduling system (APS), which takes into account multiple factors such as equipment capacity, material supply, and process routes to formulate optimal production plans. In a commercial complex project in Shenzhen, facing an urgent order for 38,000 square meters of UHPC curtain wall panels, refined production scheduling increased monthly output from the regular 20,000 square meters to 28,000 square meters, ultimately completing delivery 10 days ahead of schedule. This high efficiency is attributed to the company's four-level early warning mechanism: rolling adjustment of weekly plans, strict execution of daily plans, real-time monitoring of hourly progress, and 15-minute response to abnormal situations.

Precision Control of Production Planning

An ERP system is used for full-process planning management, with the plan achievement rate stably above 95%. Safety stock settings and capacity reservations ensure the executability of plans.

Optimization of Collaborative Supply Chain Management

A collaborative platform has been established with 86 core suppliers to achieve on-time material delivery. A supplier assessment mechanism ensures a 99% on-time rate for raw material supply.

Rapid Response Mechanism for Abnormalities

An abnormality handling mechanism has been established, with response to equipment failures within 4 hours and handling of quality abnormalities within 2 hours. This rapid response capability ensures smooth production.

Completeness of the Quality Control System

Through whole-process quality control, the first-pass acceptance rate is 99.2%. This quality stability avoids rework delays and ensures on-time delivery.

Delivery assurance requires systematic support. It is recommended to focus on examining the manufacturer's production management system and emergency handling capability. With its comprehensive management system, Qinglong UHPC has become a trusted partner for its customers.

0
Which UHPC Manufacturer Can Deliver on Time? An In-Depth Analysis of Qinglong's UHPC Contract Performance Assurance System
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.