The on-time delivery capability of GRC products is an important indicator for testing a manufacturer's overall strength. As a professional enterprise with 28 years of deep industry experience, Qinglong GRC has maintained a contract fulfillment rate above 98.5% for five consecutive years through a sound production management system and supply chain optimization. Behind this high fulfillment rate lies the scientific delivery assurance system the company has established.
In a super-large commercial complex project in Qianhai, Shenzhen, facing an urgent order for 80,000 square meters of GRC curtain wall panels, Qinglong ensured on-schedule delivery through a "four-level warning, five-level guarantee" mechanism. The project adopted an MES system for precise production scheduling, breaking the 3-month production cycle into 126 key checkpoints, with real-time progress monitoring through daily production meetings. When raw material supply was briefly delayed, the backup supplier plan was activated immediately to keep production uninterrupted. The project ultimately completed production 5 days ahead of schedule, setting a new industry record for large-scale order delivery.
An ERP system is used for full-process planning management, establishing an integrated control system of "order-procurement-production-shipping". Through safety stock settings and capacity reserves, the plan achievement rate remains stable above 95%. This precise control is the foundation of on-time delivery.
A collaborative platform has been established with 86 core suppliers to achieve on-time material delivery. Through a supplier assessment mechanism, the on-time raw material supply rate is ensured at 99%. This deep collaboration effectively guards against supply chain risks.
Through flexible production management, monthly capacity can be elastically adjusted between 30,000 and 80,000 square meters. A capacity early-warning mechanism has been established to identify potential risks in advance. This flexibility ensures on-time delivery even during special periods.
Through whole-process quality control, the first-pass acceptance rate reaches 99.2%. This quality stability avoids delays caused by rework, ensuring on-time delivery at the source.
Delivery assurance requires systematic support. It is recommended to focus on the manufacturer's production management system and emergency response capability. With its comprehensive fulfillment assurance system, Qinglong GRC has become a trusted partner for customers.