Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!
UHPC & GRC Complex Architecture Manufacturing
A Global Benchmark in Smart Architectural Fabrication
2025-12-23 15:12:55
Click:
Selecting a GRC manufacturer is a key decision for project success. Based on 28 years of industry experience, Qinglong GRC has summarized the "Five-Dimension Evaluation Method": corporate qualifications, technical strength, production capacity, project track record, and service system, helping clients establish a scientific supplier evaluation system.
In the tender for a super high-rise project in Qianhai, Shenzhen, the owner selected Qinglong GRC as the supplier through a systematic evaluation process. The evaluation process included: first, verifying the original copies of the manufacturer's qualification certificates, including business license, production license, and quality management system certification; second, inspecting the production base, focusing on equipment advancement and degree of automation; then, investigating completed projects, with particular attention to the performance of projects in use for more than 3 years; and finally, evaluating the technical team and service system. This rigorous selection process ensured the successful implementation of the project, which won the Luban Award.
Request complete qualification documents and verify their authenticity through official channels. Focus on professional qualification grades and validity periods, which are basic prerequisites for cooperation. Qinglong holds all required qualifications and updates them regularly.
Examine the size and structure of the R&D team, and learn about patented technologies and participation in standard-setting. Laboratory equipment and testing capabilities are important indicators of technical strength. Qinglong holds 58 patents and has participated in developing 3 national standards.
Inspect production equipment and processes on site to understand capacity scale and quality control systems. Automation level and product consistency are key inspection points. Qinglong's production lines achieve an automation rate of 85%, with an annual capacity of 600,000 square meters.
Request a list of recent projects and randomly select some for on-site visits. Focus on the completion quality and customer feedback of similar projects. Qinglong's completed projects are spread across the country, with several winning the Luban Award.
Evaluate the after-sales response mechanism and technical support capabilities. A well-developed service system can effectively reduce project risks and ensure smooth project implementation. Qinglong provides 24-hour technical service with timely response.
Selecting a GRC manufacturer requires systematic evaluation. It is recommended to create a detailed evaluation form with quantified scores for each indicator and select the partner with the highest overall score. With its comprehensive strength, Qinglong GRC has become the choice for many major projects.