What to Pay Attention to in UHPC Construction? Key Technical Points of Qinglong UHPC Construction

2025-12-22 17:04:32

Click:

UHPC construction requires special attention to key stages such as mix ratio control, mixing process, casting methods, and curing regimes. The quality of control in these stages directly determines the final engineering results.

For mix ratio control, the water-binder ratio must be precisely controlled between 0.18-0.22 with an error of ≤0.02; fiber content is 2%-3%, added in batches to ensure uniform dispersion. In a bridge project in Wuhan, strict mix ratio control kept the UHPC strength dispersion coefficient within 5%. The mixing process requires a forced-action mixer: dry mix for 1 minute first, then add water and mix in batches, with a total time of 4-6 minutes. This process ensures three-dimensional uniform fiber distribution.

Key Points for Material Storage Management

Cement, silica fume, and similar materials must be stored with moisture protection and controlled shelf life; fibers must be kept dry and protected from pressure to avoid clumping; admixtures must be stored away from light to prevent deterioration. These measures ensure material performance.

Measurement Accuracy Control Requirements

Weighing system accuracy must reach ±0.5%; per-batch error must be controlled within 1%; scales must be calibrated regularly to ensure accuracy. This precision is the foundation of quality.

Key Points for Temperature Control

Material temperature must be controlled at 10-30℃; cooling measures are needed in summer and insulation in winter; discharge temperature must be controlled at 5-35℃. Temperature control affects workability.

Quality Inspection System

Slump and temperature must be tested every work shift; one set of specimens must be reserved per 100 cubic meters; complete inspection records must be established. This system ensures controllable quality.

Construction control needs to be systematic. It is recommended to develop a detailed construction plan and implement it strictly. Qinglong UHPC provides construction guidance services.

0
What to Pay Attention to in UHPC Construction? Key Technical Points of Qinglong UHPC Construction
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.