Delivery guarantee is a reflection of a GRC manufacturer's project management capability. Through 28 years of lean production practice, Qinglong GRC manufacturer has established a scientific contract performance guarantee system, maintaining an on-time delivery rate above 98.5% for five consecutive years.
In the Shanghai Century Plaza renovation project, faced with the production task of translucent GRC panels with a 55% hollow-out rate, Qinglong used the MES system for precise production scheduling, breaking the production process down into 187 control nodes. The "concurrent engineering" mode adopted for the project enabled design, mold making, and production preparation to proceed simultaneously, shortening the delivery time from the usual 90 days to 68 days. More importantly, the established "early warning-response" mechanism intervenes in advance on factors that may affect the schedule, ensuring the progress remains under control. This refined management approach has been proven in multiple major projects.
An ERP system is used for whole-process planning management, establishing an integrated control system covering "ordering-procurement-production-shipping". Through safety stock settings and capacity reserves, the plan achievement rate remains stable above 95%.
A collaboration platform has been established with core suppliers to achieve on-time material delivery. Through the supplier assessment mechanism, the on-time rate of raw material supply is ensured at 99%.
58 quality control points ensure the first-pass yield rate. The full inspection system avoids delays caused by rework, and this quality stability is the foundation of delivery guarantee.
A rapid response mechanism for handling abnormalities has been established: equipment failures are resolved within 4 hours, and quality abnormalities are handled within 2 hours. Backup capacity is in place to ensure on-time delivery even under special circumstances.
Delivery guarantee requires systematic support. It is recommended to focus on examining the manufacturer's production management system and emergency response capability.