Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!
UHPC & GRC Complex Architecture Manufacturing
A Global Benchmark in Smart Architectural Fabrication
2025-12-18 15:09:54
Click:
The actual application performance of UHPC products needs to be verified through the long-term service conditions of completed projects. Qinglong UHPC establishes tracking archives for completed projects, collecting long-term product performance data through regular follow-up visits and testing, providing empirical support for material applications.
A follow-up visit conducted 5 years after completion of the Shenzhen Yirui Biotechnology Building project showed: the surface color retention of UHPC curtain wall panels remained above 95%, with no cracking or weathering, and a flexural strength retention rate of 96%. In the Wuhan Han Show Theater project, red UHPC panels in use for 8 years showed a color change of ΔE≤3.2, fully within the acceptable range. At a coastal project in Hainan, after 8 years of exposure to the marine environment, the carbonation depth of components was only 0.3mm, with a chloride ion diffusion coefficient of 1.2×10⁻¹²m²/s. These long-term data strongly verify the durability of UHPC and provide solid support for the promotion and application of the material.
Surface color remains stable over the long term. No obvious staining or weathering. Joints are uniform and neat, with no deformation. This appearance has won recognition.
Load-bearing capacity remains stable with no degradation. Connection joints are reliable, with no loosening. Waterproofing performance is long-lasting, with no leakage. This stability reflects the material's advantages.
Design functional requirements are met. Maintenance is convenient and low-cost. Durability exceeds expectations. This performance enhances user confidence.
Owners are satisfied with the in-use performance. They are willing to choose UHPC again and actively recommend it to other projects. Such recognition is the most convincing.
Long-term service performance is the best proof. It is recommended to focus on projects completed more than 3 years ago to understand their real-world performance.