How Long Is the Typical Delivery Lead Time for UHPC Manufacturers? An In-Depth Analysis of Qinglong's UHPC Delivery Management System

2025-12-18 14:51:48

Click:

The delivery lead time of UHPC products depends on factors such as order volume, product complexity, and process requirements. Standard products typically have a lead time of 30-45 days, while complex products take 60-75 days. Through lean production management, Qinglong UHPC has maintained an on-time delivery rate above 98.5% for five consecutive years.

In the Shanghai Century Plaza renovation project, facing the production task of translucent UHPC panels with a 55% openwork ratio, Qinglong used the MES system for precise production scheduling, breaking the production process down into 187 control nodes. The "concurrent engineering" model adopted for the project allowed design, mold making, and production preparation to proceed simultaneously, shortening the lead time from the usual 90 days to 68 days. More importantly, the established "early warning-response" mechanism intervenes in advance on factors that could affect the schedule, ensuring that progress stays under control. This refined management approach has been validated in multiple major projects.

Standard Product Lead Time Analysis

Flat panel products have a lead time of 30-40 days. This includes 5-7 days for mold preparation, 20-25 days for production, and 5-7 days for curing. This pace meets the needs of general projects.

Special-Shaped Product Lead Time Characteristics

Complex shaped products have a lead time of 50-70 days. Mold making takes longer, requiring 15-20 days. Special processes need more time. Lead time is positively correlated with complexity.

Rush Order Handling Capability

A green channel has been established for rush orders. Lead time can be shortened to 15-20 days. Time is compressed through parallel operations. However, quality must not be compromised.

Lead Time Assurance Measures

Lead times are safeguarded through production plan optimization. A supply chain collaboration mechanism has been established. Full-process progress monitoring is implemented. These measures improve lead time reliability.

Lead time management requires systematic operation. With its well-developed management system, Qinglong UHPC ensures the on-time delivery of customer orders.

0
How Long Is the Typical Delivery Lead Time for UHPC Manufacturers? An In-Depth Analysis of Qinglong's UHPC Delivery Management System
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.