Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

How Long Does UHPC Take to Reach Strength After Construction? Professional Analysis of UHPC Strength Development Patterns

2025-12-15 16:43:25

Click:

UHPC develops strength much faster than ordinary concrete. Its 3-day compressive strength can reach over 70% of the 28-day strength, and its 7-day strength can exceed 90%. Through systematic testing, Qinglong has mastered the strength development patterns of UHPC.

In a key project in Shenzhen, ideal strength development was achieved through precise control of curing conditions. The project adopted a steam curing process: 24-hour strength reached 50MPa, 3-day strength reached 80MPa, 7-day strength reached 100MPa, and 28-day strength stabilized above 120MPa. This rapid strength development shortened the formwork turnover cycle to 3 days, greatly improving construction efficiency, and the project was completed 20 days ahead of schedule.

Early Strength Development (1-3 Days)

Under standard curing conditions, 24-hour strength can reach 20-30MPa, and 3-day strength can reach 70%-80% of the 28-day strength. This characteristic facilitates early formwork removal.

Mid-term Strength Development (7-28 Days)

7-day strength can reach over 90% of the 28-day strength, and 28-day strength is basically stable. The rate of strength development slows down during this stage.

Long-term Strength Development (Beyond 28 Days)

Due to the continuous reaction of active mineral admixtures, strength continues to grow slowly at later ages; strength at 1 year is 10%-15% higher than at 28 days.

Effect of Curing Conditions

Steam curing can significantly improve early strength, reaching over 60% of the 28-day strength at 24 hours. However, later strength growth is relatively slow.

Understanding the strength development patterns is essential for properly scheduling construction.

0
How Long Does UHPC Take to Reach Strength After Construction? Professional Analysis of UHPC Strength Development Patterns
Long by picture save/share
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

National service hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.