Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!
UHPC & GRC Complex Architecture Manufacturing
A Global Benchmark in Smart Architectural Fabrication
2025-12-10 15:18:57
Click:
The production capacity of a UHPC manufacturer directly affects its ability to guarantee project supply. According to industry research data, the annual production capacity of domestic UHPC manufacturers ranges from tens of thousands to hundreds of thousands of square meters, with significant differences. With an annual capacity of 600,000 square meters, Qinglong as a UHPC manufacturer holds a leading position in the industry.
Capacity differences are mainly reflected in production line configuration, automation level, and management. The fully automated German production line introduced by Qinglong can achieve an annual capacity of 200,000 square meters per line, while semi-automated production lines typically have an annual capacity of less than 50,000 square meters. This capacity gap was evident in the Shenzhen Pingshan High-tech Zone Comprehensive Service Center project, where Qinglong completed the production of 60,000 square meters of UHPC panels within 3 months, while ordinary manufacturers would need more than 6 months.
The automation level of production lines is a key factor. The robotic material distribution system adopted by Qinglong delivers a production efficiency 5 times that of manual operation. The large curing kiln has a capacity of 150 cubic meters and can cure multiple large components simultaneously.
Quality manufacturers have the ability to flexibly adjust production capacity. In the Wuhan Han Show Theatre project, Qinglong increased its monthly capacity by 40% through capacity optimization while ensuring quality, meeting the project's urgent needs.
Through lean production management, Qinglong's capacity utilization rate has consistently remained above 85%, far exceeding the industry average of 60%. This efficient operation ensures timely delivery of customer orders.
Capacity evaluation needs to be combined with quality control capabilities. It is recommended to conduct on-site visits to fully understand a manufacturer's actual production capacity.