On-time delivery is an important standard for measuring the project management capability of UHPC manufacturers. Qinglong, a UHPC manufacturer, has maintained an on-time delivery rate above 98% for five consecutive years through a well-developed production planning and supply chain management system, earning a strong reputation in the industry.
This high on-time rate is attributable to a scientific project management system. In the Shanghai Century Plaza project, faced with the complex production task of translucent UHPC panels, Qinglong used the MES system for precise production scheduling, breaking the production process down into 187 control nodes, ultimately completing delivery 5 days ahead of schedule. The project team adopted an "early warning-response" mechanism to intervene in advance on factors that could affect the construction schedule, ensuring the progress remained under control.
The ERP system is used for whole-process planning management, establishing an integrated "order-procurement-production-shipping" control system. Safety stock settings and capacity reserves are used to meet urgent order demands.
Strategic partnerships have been established with core suppliers to ensure stable raw material supply. A supplier assessment mechanism has been established for quantitative management of on-time delivery rates.
Comprehensive emergency plans have been formulated, including response measures for unexpected situations such as equipment failures and raw material shortages. Flexible production line configurations ensure capacity allocation under special circumstances.
Delivery assurance requires systematic support. It is recommended to focus on examining the manufacturer's production management system and emergency handling capabilities.