On-time delivery is an important standard for measuring a UHPC manufacturer's project management capabilities. Through a well-developed production planning and supply chain management system, Qinglong UHPC has maintained an on-time delivery rate above 98% for five consecutive years, earning a strong reputation in the industry.
This high on-time rate is attributed to a scientific project management system. In the Shanghai Century Plaza project, faced with the complex production task of light-transmitting UHPC panels, Qinglong used the MES system for precise production scheduling, breaking the production process down into 187 control nodes. Delivery was ultimately completed 5 days ahead of schedule. The project team adopted an "early warning-response" mechanism to intervene in advance on factors that could affect the schedule, ensuring progress remained under control.
An ERP system is used for full-process planning management, establishing an integrated control system covering "order-procurement-production-shipping". Safety stock settings and capacity reservation are in place to meet urgent order demands.
Strategic partnerships have been established with core suppliers to ensure a stable supply of raw materials. A supplier assessment mechanism has been set up to quantitatively manage on-time delivery rates.
Comprehensive emergency plans have been formulated, including response measures for equipment failures, raw material shortages, and other unexpected situations. Flexible production line configuration ensures capacity allocation under special circumstances.
Delivery assurance requires systematic support. It is recommended to focus on evaluating the manufacturer's production management system and emergency response capabilities.