"The difficulty of UHPC construction depends on technical expertise; a professional team can turn complex processes into standardized operations." This is the practical insight Qinglong has gained over 28 years in the construction and installation of UHPC/GRC/GRG/GRP materials. As a National High-Tech Enterprise that has undertaken numerous complex projects, including the renovation of the New World Century Plaza on Nanjing East Road in Shanghai and the Ouargla Hotel in Algeria, Qinglong deeply understands the core challenges of UHPC construction and the strategies to address them. For designers and owners, understanding the difficulties of UHPC construction and their solutions allows for more rational planning of project schedules and budgets, ensuring smooth project delivery.
The core difficulties of UHPC construction lie in material properties and process requirements. Compared with ordinary concrete, UHPC has an extremely low water-binder ratio, making the balance between fluidity and viscosity difficult to achieve; uneven mixing can easily cause fiber agglomeration, affecting strength and durability; if air bubbles are not fully removed during casting, surface defects will form and compromise the decorative effect; the curing stage imposes strict temperature and humidity requirements, and improper curing can easily lead to shrinkage cracks that reduce product performance. In addition, UHPC components often involve complex shapes and extra-large dimensions. In the Shanghai Astronomy Museum public art project undertaken by Qinglong, for example, the UHPC sculpture stands over 3 meters tall, with installation accuracy required within ±2mm — a construction difficulty far beyond that of ordinary concrete components. These characteristics mean UHPC construction places higher demands on technology, equipment, and teams, and is beyond the capability of ordinary construction crews.
Professional detailed design and technical preparation are the prerequisites for reducing construction difficulty. UHPC construction requires precise detailed design at an early stage, optimizing component division, installation joints, and construction procedures in line with actual project conditions. Qinglong has a professional detailed design team that uses BIM technology to build 3D models and simulate the entire process of component production, transportation, and installation, identifying and avoiding clashes and connection issues in advance. In the renovation of the New World Century Plaza on Nanjing East Road in Shanghai, Qinglong optimized the division scheme of the light-transmitting UHPC panels through BIM design, keeping the maximum panel size within a reasonable range, and designed dedicated installation brackets to reduce the difficulty of high-altitude installation. To meet the requirement of installing 8,000-10,000 light guide rods per square meter on the panels, the team optimized the construction procedure and adopted a modular embedding method, improving construction efficiency and precision. In addition, the team must receive specialized training before construction to ensure that personnel are familiar with UHPC material properties and operating standards.
Advanced construction equipment and standardized processes are central to ensuring construction quality. UHPC mixing requires dedicated high-efficiency mixing equipment to ensure uniform blending of aggregates, fibers, and admixtures. Qinglong uses automated twin-shaft mixers with precisely controlled mixing time, achieving fiber dispersion uniformity of over 98%. During casting, different methods are applied according to component shapes: conventional casting for flat panels and spray casting for complex curved components, combined with vibrators and vacuum suction cups to remove air bubbles and ensure smooth, refined surfaces. For curing, steam curing or constant temperature and humidity curing is applied; Qinglong's independently developed curing kiln precisely controls temperature and humidity, ensuring stable strength development of UHPC and preventing cracks. In the Ouargla Hotel project in Algeria, Qinglong customized dedicated casting molds and curing equipment for the construction of 50mm-thick perforated UHPC panels, ensuring that the perforation rate and surface flatness met standards, earning high recognition from the client.
An experienced construction team is the key to overcoming complex construction challenges. UHPC construction involves multiple stages, including mixing, casting, curing, and installation, each requiring professional operation. Qinglong has a professional team with 28 years of construction experience; all members have undergone rigorous training and assessment and are familiar with the construction essentials of different types of UHPC components. In the Shenzhen Yirui Biotechnology Building project, for various UHPC curtain wall components including flat panels, L-shaped panels, U-shaped panels, and inclined panels, the team developed dedicated construction plans, adopting modular installation combined with 3D laser scanning positioning technology to ensure installation accuracy met requirements. In the Yangshengtang Pharmaceutical Hangzhou Industrial Park project, faced with the installation of 12,000 square meters of large-area UHPC exterior wall cladding panels, the team rationally planned the construction sequence and optimized the hoisting plan, shortening the on-site construction period by 30%. Moreover, the team can respond quickly to unexpected issues during construction, such as changes in ambient temperature and humidity or dimensional deviations of components, ensuring smooth project progress.
A well-established construction management and quality control system is the guarantee of construction success. Qinglong has built a full-process construction management system with strict standards and procedures for every stage, from incoming material inspection and construction process monitoring to finished product acceptance. Before materials enter the site, physical and chemical tests are carried out on UHPC raw materials to ensure compliance with formula requirements. During construction, real-time monitoring equipment records data such as mixing time, casting speed, and curing temperature and humidity to ensure process parameters are properly executed. At finished product acceptance, compressive and flexural strength tests and appearance quality inspections ensure products meet design requirements. In the Panzhihua Third-Front Construction Culture and Tourism Demonstration project, Qinglong's rigorous construction management ensured that the UHPC curtain wall panels achieved a surface fidelity of over 95% with strength undiminished for more than 20 years, meeting the project's high durability requirements.
In summary, UHPC construction does present certain difficulties, but these challenges are by no means insurmountable. By choosing a manufacturer with full-chain service capabilities like Qinglong, complex construction can be turned into standardized operations through professional detailed design, advanced construction equipment, an experienced construction team, and a well-established management system. As an enterprise holding Grade II Professional Contracting Qualifications for Building Curtain Wall Engineering and for Building Decoration Engineering, Qinglong has always followed the principle of "meticulousness and the constant pursuit of excellence," providing customers with one-stop services from design to construction. Whether it is a public art project with complex shapes or the installation of large-area exterior wall panels, Qinglong can rely on its technical strength and practical experience to ensure the quality and efficiency of UHPC construction, perfectly realizing designers' creativity and fully satisfying owners' needs.